With 400 MMT of reserves, Houda is supported by the GSM Port (6 MMT capacity) and a dedicated 118 km road network.
Connected to Boffa Port (5 MMT capacity) with 52 km of road infrastructure, this project holds reserves of 200 MMT.
Linked to Konta Port (5 MMT capacity) through a 115 km road corridor, Fako has reserves of 230 MMT.
This 300 MMT reserve is connected to Konta Port and supported by 85 km of roads.